Services

Anchor and Mooring Installation & Recovery

Cable Lay Barge Anchor Handling

The Green Isle was utilised as an anchor handling vessel during the BorWind 1 cable installation works by Prysmian.

The Green Isle ran mooring lines and installed and recovered the 13t Delta Flipper anchors. Green Marine were required to gain a certificate of equivalence (CoE) as part of this contract.  On arrival in Germany, the initial survey was performed and draft report provided.  Green Marine responded to all findings with a close out report within 24 hours evidencing our compliance on all points.

BACK TO Anchor and Mooring Installation & Recovery OVERVIEW