Cable Lay Barge Anchor Handling
The Green Isle was utilised as an anchor handling vessel during the BorWind 1 cable installation works by Prysmian.
The Green Isle ran mooring lines and installed and recovered the 13t Delta Flipper anchors. Green Marine were required to gain a certificate of equivalence (CoE) as part of this contract. On arrival in Germany, the initial survey was performed and draft report provided. Green Marine responded to all findings with a close out report within 24 hours evidencing our compliance on all points.