Experience

From its inception, Green Marine achieved a close working relationship with Andritz Hydro Hammerfest (AHH). In 2013 they awarded us the contract to install their HS1000 1MW tidal turbine. 

Careful and detailed planning saw the HS1000 installed successfully in August 2013 – the first time this had been done using a catamaran barge.

Following the success of the installation, in 2015 AHH awarded Green Marine the contract to retrieve the HS1000. All planning, engineering and operations were carried out successfully, safely and within budget.

The wave energy device developer Wello Oy identified the expertise that we could provide for their operations. Green Marine have been their primary marine contractor since 2012, installing, maintaining and retrieving their wave energy convertor ‘Penguin’.

Green Marine have also carried out a wide range of work for other clients, including: